ENVIRONMENTALLY BENIGNFRONT-END-OF-LINE SURFACE PREP
In-Situ Bath Contamination Monitoring
Maintains yields
Increases tool utilization
Reduces consumables
25% of process steps
Average annual fab consumption
5 GWh electricity
240 million gallons water
300 tons hazardous chemicals