Example
The problem addressed:
- Given a subset of tasks/tools in the plasma processing section, select a processing route that satisfies production demand, while minimizing waste generated.
-
More specifically:
- New technologies for interconnect materials less than 0.15?m and hence with dielectric constant ?~2 need to be evaluated.